NKM Arcade — Commercial MEP Case Study
NKM Arcade is a completed 9,500 sq.ft commercial project in Puthanathani, Kerala. EENOKI’s documented scope covered Electrical, Plumbing and HVAC design, together with design documentation, cost-estimation support and technical coordination.
Commercial frontage and service coordination context.
The project 3D shows the NKM Arcade commercial frontage used during design development. The visual is presented as project context while keeping client and architect names private as requested.
EENOKI scope: Electrical, Plumbing and HVAC Design. Client and architect names are intentionally not published on this page.
Verified project scope
EENOKI’s project proposal dated 16 December 2024 records a combined commercial area of approximately 9,500 square feet and lists Electrical system design, Plumbing system design and HVAC system design within the agreed scope.
Electrical Power & Lighting Design
The documented Electrical scope included load assessment, transformer and generator selection, protection-equipment selection, Distribution Board and panel design, cable and feeder selection, cable-tray / conduit routing, interior and exterior lighting, lighting schemes, power layouts, CCTV / extra-low-voltage provisions, power-distribution schematics, BOQ / tender documentation and material specifications.
Plumbing Design
The documented Plumbing scope included cold- and hot-water systems, stormwater design, pipe sizing and routing, zone-control valves, water-supply layouts, drainage pipe selection and routing, manhole positioning, drainage layouts, BOQ / tender documentation and material specifications.
HVAC Design
The HVAC scope included detailed heating and cooling load calculations, system selection, equipment sizing and specification, layout and routing, ventilation-system design, material specifications and BOQ / tender documentation.
Project process and site coordination
The documented workflow included meetings and discussions, preliminary drawings, a technical site visit, final drawings and further site coordination where required. This type of process helps the three core MEP disciplines develop against the same architectural and execution requirements rather than as isolated packages.
Why coordinated MEP matters in a commercial arcade
Commercial projects bring together customer-facing areas, power distribution, lighting, water supply, drainage, ventilation and back-of-house service requirements. When Electrical, Plumbing and HVAC are developed together, the design can reduce avoidable clashes between routes, equipment areas and architectural finishes.
For NKM Arcade, the public case study focuses on the coordinated full-MEP scope and completed project status rather than publishing private client or architect information.
Completed project
The project has been completed. This page therefore presents NKM Arcade as a completed commercial MEP reference while keeping the public claims limited to the confirmed project identity, location, area, EENOKI scope, project visual and completed status.
Related EENOKI services
Coordinate Electrical, Plumbing and HVAC before site execution.
Share the architectural plan, project area, current stage and required services for a focused MEP discussion.