NKM Arcade is a completed 9,500 sq.ft commercial project in Puthanathani, Kerala. EENOKI’s documented scope covered Electrical, Plumbing and HVAC design, together with design documentation, cost-estimation support and technical coordination.

Electrical DesignPlumbing DesignHVAC DesignCommercial CoordinationCompleted Project
Actual Project 3D

Commercial frontage and service coordination context.

The project 3D shows the NKM Arcade commercial frontage used during design development. The visual is presented as project context while keeping client and architect names private as requested.

Actual 3D facade visual of NKM Arcade commercial project in Puthanathani.
NKM Arcade, Puthanathani. Actual project 3D visual cropped to the public project facade.

EENOKI scope: Electrical, Plumbing and HVAC Design. Client and architect names are intentionally not published on this page.

Verified project scope

EENOKI’s project proposal dated 16 December 2024 records a combined commercial area of approximately 9,500 square feet and lists Electrical system design, Plumbing system design and HVAC system design within the agreed scope.

Electrical Power & Lighting Design

The documented Electrical scope included load assessment, transformer and generator selection, protection-equipment selection, Distribution Board and panel design, cable and feeder selection, cable-tray / conduit routing, interior and exterior lighting, lighting schemes, power layouts, CCTV / extra-low-voltage provisions, power-distribution schematics, BOQ / tender documentation and material specifications.

Plumbing Design

The documented Plumbing scope included cold- and hot-water systems, stormwater design, pipe sizing and routing, zone-control valves, water-supply layouts, drainage pipe selection and routing, manhole positioning, drainage layouts, BOQ / tender documentation and material specifications.

HVAC Design

The HVAC scope included detailed heating and cooling load calculations, system selection, equipment sizing and specification, layout and routing, ventilation-system design, material specifications and BOQ / tender documentation.

Project process and site coordination

The documented workflow included meetings and discussions, preliminary drawings, a technical site visit, final drawings and further site coordination where required. This type of process helps the three core MEP disciplines develop against the same architectural and execution requirements rather than as isolated packages.

Why coordinated MEP matters in a commercial arcade

Commercial projects bring together customer-facing areas, power distribution, lighting, water supply, drainage, ventilation and back-of-house service requirements. When Electrical, Plumbing and HVAC are developed together, the design can reduce avoidable clashes between routes, equipment areas and architectural finishes.

For NKM Arcade, the public case study focuses on the coordinated full-MEP scope and completed project status rather than publishing private client or architect information.

Completed project

The project has been completed. This page therefore presents NKM Arcade as a completed commercial MEP reference while keeping the public claims limited to the confirmed project identity, location, area, EENOKI scope, project visual and completed status.

Privacy and evidence standardClient and architect names are withheld by request. The project visual is used only as approved project context, and the technical scope is based on the project proposal rather than unsupported assumptions about final installed performance.

Related EENOKI services

Planning a Commercial Project?

Coordinate Electrical, Plumbing and HVAC before site execution.

Share the architectural plan, project area, current stage and required services for a focused MEP discussion.

WhatsApp EENOKI