Vakery Juma Masjid — Electrical & Plumbing Project
Vakery Juma Masjid is a 7,500 sq.ft mosque project in Vakery, Wayanad. EENOKI’s documented scope covers Electrical and Plumbing design. The project is currently under construction.
Project context
EENOKI’s project proposal identifies the project at Vakery and records a combined area of approximately 7,500 square feet. The documented consultancy scope covers Electrical system design and Plumbing system design, along with drawings, schematic diagrams, schedules, cost-estimation support, technical guidance and site clarification visits.
Electrical design scope
The documented Electrical scope includes:
- Assessment of electrical loads.
- Selection of protection equipment.
- Cable and feeder selection considering short-circuit and voltage-drop requirements.
- Interior and exterior lighting design.
- Power-supply layout preparation.
- CCTV and other extra-low-voltage layout provisions.
- BOQ and tender documentation.
Plumbing design scope
The documented Plumbing scope includes:
- Cold-water supply system design.
- Pipe sizing and routing.
- Zone-control valve selection.
- Water-supply layout preparation.
- Drainage pipe selection and routing.
- Manhole positioning based on site orientation and levels.
- Drainage-system layout preparation.
Design and coordination process
The documented workflow includes initial meetings and discussions, preparation of preliminary drawings, design review and revision, final drawings and further site coordination as required. This type of iterative process is important for keeping Electrical and Plumbing services aligned with the architectural plan and actual site conditions.
Current project status
The project is currently under construction. The public case study therefore does not imply final completion, installed-system performance or commissioning results. It records only the confirmed project identity, location, area, Electrical and Plumbing scope and current construction status.
Why coordinated services matter in a mosque project
A mosque combines prayer spaces, ablution and sanitary areas, circulation, lighting, water supply, drainage and public-use requirements. Electrical and Plumbing design need to support these functions without creating avoidable conflicts during construction.
Early coordination is especially useful for lighting positions, power routes, water-supply lines, drainage levels, manholes and service access because those decisions become harder to change after finishes and site works progress.
Related EENOKI services
Coordinate Electrical and Plumbing before site execution advances.
Share the architectural plan, project area, current stage and required services for a focused MEP discussion.