Sultan Bathery Restaurant Project — MEP Case Study
A 4,000 sq.ft restaurant project in Sultan Bathery, Kerala, with EENOKI scope covering Electrical, Plumbing and HVAC design. Construction is currently ongoing.
Supplied 3D views from the actual restaurant project.
The front and corner views establish the architectural context for the project, including the street-facing frontage, upper-level treatment, external lighting elements and the building's corner exposure. The visuals are displayed exactly as supplied for project context.
No client or architect name is added to the written project details on this page. The supplied artwork itself is left unchanged.
Verified project facts
This is a 4,000 sq.ft commercial restaurant project in Sultan Bathery. EENOKI's confirmed consultancy scope covers Electrical, Plumbing and HVAC design. The project is currently under construction.
Electrical design scope
The verified proposal includes electrical system design and documentation for the project. The design scope covers core power and lighting planning, electrical distribution requirements, protection and feeder selection, layout preparation and schematic documentation required for coordinated project execution.
Plumbing design scope
The plumbing scope includes water-supply and drainage design, pipe sizing and routing, stormwater planning, drainage layout preparation and coordination of access points and site-level drainage requirements.
HVAC design scope
The HVAC scope includes load calculations, system selection, equipment sizing, routing and ventilation design, together with the supporting specifications and documentation required for the project.
Why this project is useful as a case study
A restaurant project brings Electrical, Plumbing and HVAC requirements into a compact commercial footprint where the services need to be developed as one coordinated package. The supplied front and corner views also show a strongly designed public-facing façade, making early coordination important so that engineering services can be planned without undermining the architectural intent.
Because construction is still ongoing, this page does not present the project as a completed installation and does not make claims about final operating performance.
Related EENOKI services
Coordinate Electrical, Plumbing and HVAC before site execution.
Share the architectural plan, project area, location, current stage and required services for a focused MEP discussion.
